Al Yassat Island Development
- Theme
- Integrated Civil & Infrastructure Developments
- Client
- Department of Presidential Affairs (DOPA)
- Country
- UAE
- Status
- Ongoing
Scope of Work
Multi-disciplinary EPC development of a private island into a fully integrated lifestyle, tourism, and leisure destination, including infrastructure, utilities, hospitality assets, and recreational facilities.
Hospitality & VIP developments: Construction of ultra-luxury villas, beachfront club, and a 5-star hotel and resort, including guest accommodation, event spaces, wellness facilities, and operational back-of-house infrastructure.
Recreational & sports facilities: Development of multi-purpose sports arena and equestrian complex including stables, training tracks, and spectator facilities, integrated with landscaped leisure zones.
Roads & infrastructure: Island-wide road network including primary, secondary, and service roads; approx. 500 m covered roadway with architectural shading structures; full site access and circulation infrastructure.
Deep utilities: Treated water distribution networks (various diameters, ~12 km total); foul sewer DN250–DN700mm; stormwater culverts DN500–DN1500mm; pump stations and rising mains
Shallow utilities: Electrical duct banks (11kV and 33kV), street lighting network, telecoms, and fibre optic conduit runs throughout island sectors
STP & substations: Sewage treatment plant civil and M&E works; primary and secondary substation civil construction; treated effluent reuse network
External works & enabling: Bulk earthworks, excavation, underground utilities, cable networks, landscaping, public realm development, and coastal integration works.
EPC delivery: Full EPC execution including design, engineering, procurement, construction, testing, commissioning, and phased delivery.