Hudayriyat Floating Bridge Piling Work

Theme
Enabling Works / Piling / Ground Improvement
Client
MODON
Country
UAE
Status
Completed
Scope of Work

The scope of work covers the installation of the Piles, Pile Bracings and Testing for the Mussafah channel crossing floating bridge, access from Hudayriyat Island to Musaffah.
 
A total of 7 piles (Mooring Piles – 3 No's, Pivot Piles – 3 No's & Parking Piles – 1 No's) 1375 mm OD have been installed.

Total piles driven : 7 No's 
PDA Testing : 2 No's