LULU Bridge Construction
- Theme
- Bridges
- Client
- Eagle Hills
- Country
- UAE
- Status
- Ongoing
Scope of Work
Execution of permanent bridge works and associated enabling and marine access works for Lulu Island development, Abu Dhabi, including causeway formation works and full site preparation related to bridge connectivity and offshore access.
Bridge works: Permanent vehicular bridge from Mina Zayed side; approx. 200 lm length with spans of ~40 m; designed with 21 m air clearance; includes structural works, street furniture, road furniture, and service access provisions.
Causeways & marine works: Construction of two causeways (~1000 lm total), including formation works to facilitate bridge connectivity, marine access, and development access to the island.
Enabling works: Demolition, site clearance, temporary facilities setup, temporary jetty construction, marine access preparation, and logistics support for offshore execution.
Logistics & access: Offshore island operations utilizing marine transport routes for personnel, equipment, and materials via approved access points.
Integrated construction delivery: Site enabling, marine works, bridge infrastructure, earthworks, and associated offshore development works through construction and authority handover.
Go Back