Replacement of TB-3 Mooring System (Anchor Piles & Chanis)

Theme
Offshore
Client
ADNOC Offshore, UAE
Status
Ongoing
Contract Type
EPC
Scope of Work

Installation of 6 No. Anchor Piles, 6 No. Anchor Chains & 1 No. Wave Height Measurement System.

  • Removal of 6 No. Existing Anchor Chains, 6 No. Existing 30 Ton Clump Blocks & 6 No. Existing Anchor Piles at Mudline level.
  • Modification and Integration with existing RTU and DCS.